Trying a first pass at View Planner 3.6. I set everything up per the planning guide, but the first inconsistency I found was that after loading the View Planner software on the Desktop VM, it did the expected, Power Down, Snap Shot, Power Up sequence; however the document suggests it would come back to an "Installation Complete" box, but it came up to a Cmd window where it seems to have loaded some registry settings and then stopped. I checked that the View Planner service was running so I decided to try a run. It gets stopped on "Connect-Start-Workload", and both clicking on that button, as well as viewing the viewplanner.log file, show the User Test1 not connected or started. I'm not sure where a user "Test1 " comes from, I can log into the VM as Administrator. Any suggestions? I'm racing the clock and need to run a few Remote Mode multi-VM tests by Thursday and can't even get a local mode to pass!
Thanks